
During this phase, the schematic plan is further developed into a detailed CAD drawing of the foodservice equipment. Each item of equipment is identified and keyed to product data sheets, utility load schedules, and preliminary budget numbers. Special conditions that affect architectural elements are identified. The design development package is typically submitted to the health department or code authorities for approval.